The Hong Kong–Zhuhai–Macau Bridge is an ongoing construction project which consists of a series of bridges and tunnels that will connect Hong Kong, Macau and Zhuhai, three major cities on the Pearl River Delta in China. The 50 km link is expected to cost US$10.6 billion. The longest bridge section will be 29.6 km (18.4 mi) long and will include three cable-stayed spans between 280 and 460 m (920 and 1,510 ft).Construction formally began on 15 December 2009.The bridge is due for completion in late 2016. To date Jodek have supplied an estimated 36 tonne of machined threaded components for all different aspects of this bridge project.

 